BP has had to bite the bullet and decide to retrieve and rebuild the entire subsea production system for its troubled Thunder Horse field in the US Gulf, further delaying the company's flagship project.The UK major said that a series of tests carried out over the past four months revealed metallurgical failure in components of the subsea system. BP said the problem became evident when it conducted pre-commissioning tests by pumping water through the system to establish system integrity. The equipment passed all the normal industry standard tests and regulatory requirements. But more prolonged and rigorous testing resulted in failure on a subsea weld.
机译:英国石油公司表示,BP不得不忍耐不住,决定为其陷入困境的美国海湾的雷马油田收回并重建整个海底生产系统,这进一步拖延了该公司的旗舰项目。四个月后,发现海底系统的组件发生了冶金故障。 BP表示,在进行试运行前测试时,通过向系统中抽水以建立系统完整性,该问题变得显而易见。该设备通过了所有正常的行业标准测试和法规要求。但是,更长时间和更严格的测试导致海底焊接失败。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号