首页> 外文期刊>E&P daily >Shah Deniz nears completion
【24h】

Shah Deniz nears completion

机译:Shah Deniz即将竣工

获取原文
获取原文并翻译 | 示例
           

摘要

Operator BP has completed the installation of the gas and condensate production platform for the Shah Deniz field in the Caspian Sea off Azerbaijan.Shah Deniz is planned to produce some 8.5 Bcm of gas per year and 37,000 b/d of condensate.The gas from the field will mainly be piped through the Sangachal terminal south of Baku and from there to Turkey, but some of the gas will also be sold to Azerbaijan and Georgia. The condensate will be piped to Ceyhan on Turkey's Mediterranean coast.
机译:BP公司已经完成了在阿塞拜疆附近里海的Shah Deniz油田的天然气和凝析油生产平台的安装,Shah Deniz计划每年生产约8.5 Bcm的天然气和37,000 b / d的凝析油。天然气将主要通过巴库以南的Sangachal码头通过管道输送,再从那里运至土耳其,但部分天然气也将被出售给阿塞拜疆和乔治亚。冷凝水将通过管道输送到土耳其地中海沿岸的Ceyhan。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号