Premier Oil is pushing ahead with its Blackbird and Dua development in Block 12W offshore southern Vietnam and has already pre-qualified contractors for the FPSO required on the project.E&P Daily hears that the FPSO will have a production rate of 50,000-60,000 b/d of oil and a storage capacity of 1m bbl.Contractors are expecting invitations to tender to be issued in January,with a contract award due before the end of the second quarter of 2008.
展开▼
机译:Premier Oil正在越南南部近海12W区块进行黑鸟和Dua的开发,并且已经对该项目所需的FPSO进行了资格预审.E&P Daily听说FPSO的产能将为50,000-60,000 b / d承包商预计将在1月份发布招标书,并在2008年第二季度末之前授予合同。
展开▼