LACK OF AEC COLLABORATION HITTING PROJECT DEADLINES AND BUDGETS

机译:缺少AEC合作击中项目的截止日期和预算

获取原文
获取原文并翻译 | 示例
       

摘要

Despite widespread adoption of better AEC industry processes, such as BIM Level 2, research reveals that less than one in ten (8%) AEC professionals feel that the level of cross-stakeholder collaboration is highly effective within their organisation. In fact, the majority (95%) of respondents said that changes could be made within their organisation to drive more effective collaboration on today's projects. As a result, client projects are being heavily impacted, with half (50%) of survey respondents who believe that the level of cross-stakeholder collaboration is not effective or could be improved, reporting that client projects had run over deadline, or gone over budget (50%).
机译:尽管广泛采用了更好的AEC行业流程(例如BIM Level 2),但研究表明,不到十分之一(8%)的AEC专业人士认为,跨利益相关者的合作水平在他们的组织内非常有效。实际上,大多数(95%)的受访者表示,可以在组织内部进行更改,以推动在当今项目上进行更有效的协作。结果,客户项目受到了严重影响,一半(50%)的调查受访者认为跨利益相关者协作的水平无效或无法改善,并报告客户项目已超过期限或已结束预算(50%)。

著录项

  • 来源
    《Building Engineer》 |2016年第12期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 09:11:56

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号