Cirrus Energy has fired up production from its Dutch North Sea L8-D field. The producing well L11b-A06 was drilled in early 2009 into the L8-D field from the L11b-A production platform. The platform has just been refurbished by TAQA Offshore which is managing production operations on behalf of the L8-D Group.
展开▼