首页> 外文期刊>E&P daily >Schiehallion FPSO replacement
【24h】

Schiehallion FPSO replacement

机译:Schiehallion FPSO更换

获取原文
获取原文并翻译 | 示例
           

摘要

BP's ageing Schiehallion FPSO is to be replaced within six years in the UK West of Shetlands region with a new more advanced floating production unit capable of greater oil recovery from the field area. Replacing the FPSO is considered more economic than modifying the existing unit, which was installed back in 1998, and a new FPSO will have to work with the extensive subsea hardware already installed at the field in UK Block 204/20a at a water depth of 1,394ft (425m), delegates at the Pilot Share Fair held in Aberdeen were told.
机译:BP老化的Schiehallion FPSO将在6年内在英国设得兰群岛西部地区替换为一个新的,更先进的浮动生产装置,该装置能够从油田开采更多的石油。更换FPSO被认为比修改于1998年安装的现有设备更经济,并且新的FPSO将必须与已在英国204 / 20a区块水深1,394的现场安装的大量海底硬件一起工作。英尺(425m),在阿伯丁举行的飞行员股票交易会的代表被告知。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号