首页> 外文期刊>E&P daily >Saipem's GoM double
【24h】

Saipem's GoM double

机译:Saipem的GoM Double

获取原文
获取原文并翻译 | 示例
           

摘要

Italy's Saipem has won two contracts for work in the US Gulf of Mexico (GoM).The contractor landed pre-commissioning, commissioning and jumper metrology work for work in the East Block field in the Gulf. Work will start in early May and take around 45 days to complete.Saipem also grabbed the Don Larsen/Drysdale-2 offshore installation project in the deepwater GoM. The project includes the offshore installation of the jumpers, subsea distribution unit, flying leads, and relocation of the Drysdale step-out umbilical for the Don Larsen and Drysdale-2 operated by Anadarko Petroleum.
机译:意大利的塞佩姆(Saipem)在美国墨西哥湾(GoM)赢得了两份工作合同,承包商在海湾的东区(East Block)进行了预调试,调试和跨接计量工作。工程将于5月初开始,大约需要45天才能完成。塞佩姆还获得了深水GoM中的Don Larsen / Drysdale-2海上安装项目。该项目包括在海上安装跳线,海底分配装置,飞线,以及为阿纳达科石油公司运营的Don Larsen和Drysdale-2换装Drysdale跨接脐带。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号