...
首页> 外文期刊>E&P daily >Pumps on at UK Wood
【24h】

Pumps on at UK Wood

机译:在英国伍德泵

获取原文
获取原文并翻译 | 示例

摘要

Talisman Energy has turned the taps on at the Wood field in the UK North Sea,with expected peak production of 6,000 b/d of oil and 16 MMcf/d(45 Mcm/d)of natural gas.The new facilities will allow the export of an additional 9 MMcf/d(25 Mcm/d)from the Montrose,Arbroath,Arkwright and Brechin(MonArb)fields.The Wood field is located around 209km east of Aberdeen,10km southeast of the Montrose platform in UKCS Block 22/18.
机译:塔利斯曼能源(Talisman Energy)已在英国北海的伍德油田开始开采,预计峰值产量为6,000桶/天的石油和16 MMcf / d(45 Mcm / d)的天然气。新设施将允许出口分别来自Montrose,Arbroath,Arkwright和Brechin(MonArb)油田的9 MMcf / d(25 Mcm / d).Wood油田位于阿伯丁以东209公里左右,在UKCS 22/18号区块的Montrose平台东南10公里处。 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号