...
首页> 外文期刊>Building Engineer >THE ECO-HOME DESIGN GUIDE
【24h】

THE ECO-HOME DESIGN GUIDE

机译:生态家居设计指南

获取原文
获取原文并翻译 | 示例

摘要

For many years following the catastrophic effects of World Warn, the UK used to build more than 300,000 new homes per annum. It is now claimed that recently only about half that number have been delivered each year. David Cameron has announced that he expects Local Authorities to bring forward local plans demonstrating positive action to help attain this government's ambition of creating one million new homes by 2020.
机译:在《世界警告》(World Warn)造成灾难性影响之后的许多年里,英国过去每年建造超过30万套新房屋。现在据称,最近每年仅交付约一半的数量。戴维·卡梅伦(David Cameron)宣布,他希望地方当局能够提出地方计划,展示出积极行动,以帮助实现政府在2020年之前建造100万套新房的雄心。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号