首页> 外文期刊>E & P: A Hart Energy Publication >New solution for an old problem
【24h】

New solution for an old problem

机译:解决旧问题的新方法

获取原文
获取原文并翻译 | 示例
       

摘要

Tools designed using acoustic theory can mitigate the costs and lost time associated with stuck pipe. Stuck pipe can make or break a drilling project. Lost time, equipment damage, and lower return on investment are symptoms of this common problem. Conventional fishing tool techniques have been in use since the early 1800s. They still are the first choice for many operators. Since 1996, Vibration Technology Inc., a Layne Christensen company, has used resonant energy for stuck pipe applications. The company applies acoustic theory to transmit standing wave resonant energy over long intervals of pipe in oil and gas wells. The company's equipment and procedures have proven to be one of the most cost-effective means of stuck pipe recovery currently available to the industry.
机译:使用声学理论设计的工具可以减少因卡死管道而带来的成本和损失的时间。卡住的管道可能会成败一个钻探项目。浪费时间,设备损坏和较低的投资回报率是此常见问题的征兆。自1800年代初以来,一直在使用传统的捕鱼工具技术。它们仍然是许多运营商的首选。自1996年以来,Layne Christensen公司旗下的Vibration Technology Inc.就将共振能量用于卡套管应用。该公司应用声学理论在油气井中的长距离管道上传输驻波共振能量。事实证明,该公司的设备和程序是目前行业中可用的最经济有效的管道堵塞回收方法之一。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号