【24h】

Riser Maintenance Pays Off

机译:立管维护有回报

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Proper care can prevent expensive riser failures. Risers, key links between subsea components and topside drilling rigs or production platforms, merit a big shot of technology as operators battle a host of ailments that could cause premature failure, spills and loss of production revenues. It's not uncommon to see riser systems cover more than a mile (1.6 km) from the surface to the seabed, and steel catenary riser (SCR) lengths are getting longer. With those longer lengths, risers experience more stress and fatigue. Added materials, such as buoyancy wraps, complicate the riser's reaction to currents and eddies.
机译:适当的护理可以防止昂贵的冒口故障。提升器是海底部件与顶置钻机或生产平台之间的关键链接,在操作人员应对可能导致过早故障,泄漏和生产收入损失的各种疾病时,值得一看。常见的情况是,立管系统从地面到海床的距离超过一英里(1.6公里),并且钢悬链立管(SCR)的长度越来越长。长度较长时,立管会承受更大的压力和疲劳。附加材料(例如,浮力包裹物)会使立管对水流和涡流的反应复杂化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号