首页> 外文期刊>E & P: A Hart Energy Publication >Focus shifts from wellbore to reservoir completion: By dividing the reservoir into discrete intervals, the operator can individually stimulate each interval
【24h】

Focus shifts from wellbore to reservoir completion: By dividing the reservoir into discrete intervals, the operator can individually stimulate each interval

机译:重点从井眼转移到储层完井:通过将储层划分为不连续的层段,操作员可以分别激发每个层段

获取原文
获取原文并翻译 | 示例
       

摘要

I would say in general what is happening in the completions industry right now is that our focus is changing from completing a wellbore to completing the reservoir itself. I think the major issues we hear from a lot of the operators are on the cost side. As the wells become more complex, they are worried about cost. We have to continue to work on the efficiency side to find ways to develop these things more quickly. We have to find ways to make the overall operation more economical for the customer.
机译:我要说的是,一般而言,目前在完井行业中正在发生的事情是,我们的重点正在从完成井眼转变为完成储层本身。我认为我们从许多运营商那里听到的主要问题都在成本方面。随着井变得越来越复杂,他们担心成本。我们必须继续在效率方面进行工作,以找到更快地开发这些产品的方法。我们必须找到使客户的整体运营更经济的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号