首页> 外文期刊>E & P: A Hart Energy Publication >World's first all-electric subsea production system comes online
【24h】

World's first all-electric subsea production system comes online

机译:世界上第一个全电动海底生产系统上线

获取原文
获取原文并翻译 | 示例
       

摘要

The world's first all-electric subsea production system came onstream in September of 2008 as part of the K5F project developed by Total E&P Nederland B.V. (TEPNL) in the Dutch Sector of the North Sea. The CameronDC system includes a three-well template/manifold with a two-well initial installation, with the option for a third well. The all-electric control system is configured for a four-well application, designed to accommodate the fourth tree as a step-out. The template/manifold is installed in 131 ft (40 m) of water and is controlled from an existing platform 11.2 miles (18 km) away. Production is piped 6.2 miles (10 km) to an unmanned platform.
机译:作为道达尔E&P Nederland B.V.(TEPNL)在北海荷兰地区开发的K5F项目的一部分,世界上第一个全电动海底生产系统于2008年9月投入生产。 CameronDC系统包括一个三孔模板/歧管以及两个孔的初始安装位置,并可以选择第三个孔。全电控制系统配置为用于四井应用,旨在容纳第四棵树作为步伐。模板/歧管安装在131英尺(40 m)的水中,并通过11.2英里(18 km)远的现有平台进行控制。生产过程通过管道将6.2英里(10公里)输送到无人驾驶平台。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号