首页> 外文期刊>E&P daily >Kalimantan development hopes
【24h】

Kalimantan development hopes

机译:加里曼丹的发展希望

获取原文
获取原文并翻译 | 示例
           

摘要

Two appraisal wells have been a success on the South Sembakung gas and condensate prospect in East Kalimantan,Indonesia - with initial data suggesting development is commercially viable.The South Sembakung-2(SS-2)and South Sembakung-3(SS-3)wells were drilled by the Apexindo-2 rig in the Simenggaris Block and hit multiple gas-bearing sandstones,said partner Salamander Energy.Two zones in SS-2 well flowed at a combined rate of 13 MMcf/d of gas,while one interval at SS-3 well flowed at 500 Mcf/d.
机译:印尼东部加里曼丹的南Sembakung天然气和凝析气勘探井已成功进行了两口评估井-初步数据表明该开发具有商业可行性.South Sembakung-2(SS-2)和South Sembakung-3(SS-3)合作伙伴萨拉曼德能源公司(Salamander Energy)表示,该井是在Simenggaris区块的Apexindo-2钻机上钻出的,打中了多块含气砂岩。SS-2井中的两个区域以13 MMcf / d的天然气总流量流过,而一个井间隔为SS-3井流量为500 Mcf / d。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号