首页> 外文期刊>E&P daily >Technip takes Nigeria Ofon load
【24h】

Technip takes Nigeria Ofon load

机译:Technip承担尼日利亚Ofon的任务

获取原文
获取原文并翻译 | 示例
           

摘要

Technip has been awarded a turnkey contract by Total for the loading, transport and installation of the topsides for the Ofon Phase 2 fixed platform off Nigeria.The field is 50km off the coast at a water depth of 131ft (40m) and the contract comprises the engineering, supply of equipment required for the installation, loading of the 13,000 ton topsides onto a transport vessel, the transport of the top-sides from Hyundai Heavy Industries yard in South Korea to Nigeria and the installation of the topsides using Technip's proprietary Unideck floatover method.
机译:Technip已被道达尔(Total)授予总承包合同,用于在尼日利亚以外的Ofon Phase 2固定平台的顶部进行装载,运输和安装,该油田位于海岸50公里处,水深131ft(40m),包括工程,安装所需的设备供应,将13,000吨的顶板装载到运输船上,将顶板从韩国现代重工堆场运输到尼日利亚,以及使用Technip专有的Unideck浮法安装顶板。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号