首页> 外文期刊>E & P: A Hart Energy Publication >New running tool ensures successful landing of completion string
【24h】

New running tool ensures successful landing of completion string

机译:新的运行工具可确保成功完成完井管柱

获取原文
获取原文并翻译 | 示例
       

摘要

Peace of mind is a good thing when investing in a costly completion application. Proper placement of the completion string can be challenging for some reservoirs. Not getting it right the first time can lead to sunk cost and extensive nonproductive time (NPT). Managing this risk has become more accessible as running tools improve. One example, the Deep Casing Tools (DCT) Shalerunner, was designed as a cost-effective method for running completion strings in shale wells. The tool adds a balanced highspeed rotating reamer shoe to the completion, allowing the operator to essentially drill the completion in. The tool can reduce wiper trips since the completion itself has the ability to wash, ream, and reestablish the borehole. This allows for the completion to be landed without a need for rotation and without any risk of prematurely setting the liner hanger.
机译:投资昂贵的完成应用程序时,省心是一件好事。对于某些油藏而言,完井管柱的正确放置可能是一项挑战。第一次使用不正确会导致沉没成本和大量的非生产时间(NPT)。随着运行工具的改进,管理此风险变得更加容易。例如,深套管工具(DCT)Shalerunner被设计为一种在页岩井中运行完井管柱的经济有效的方法。该工具为完井增加了平衡的高速旋转铰刀靴,使操作员可以在其中进行完钻。由于完井本身具有冲洗,扩孔和重建钻孔的能力,因此该工具可以减少刮水器跳闸。这允许完成件落地而无需旋转并且没有过早设置衬管悬挂器的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号