【24h】

Building for speed

机译:打造速度

获取原文
获取原文并翻译 | 示例
       

摘要

The crewboat and supply boat sector of the offshore industry is as constrained as the mobile offshore drilling unit segment. Demand is high, availability is scarce and there is a global need for additional vessels. Seacor Holdings Inc. subsidiary Seacor Marine launched a new crewboat on Feb. 19, 2008, the most recent step of a fleet expansion project that will help make up the deficit in the crewboat and supply boat industry. The new vessel, the Seacor Cheetah, will be used for both personnel and cargo transfer. It is the first of three in the CrewZer class to be added to Seacor's fleet.
机译:海上作业的乘员船和补给船领域受到限制,就像移动式海上钻井装置部门一样。需求很高,可用性稀缺,并且全球范围内都需要其他船只。 Seacor Holdings Inc.的子公司Seacor Marine于2008年2月19日推出了新的乘员船,这是船队扩展项目的最新一步,将有助于弥补乘员船和补给船行业的不足。 Seacor Cheetah这艘新船将用于人员和货物运输。这是在Seacor机队中加入的CrewZer类中的第三个。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号