首页> 外文期刊>E&P daily >BG's Brazil success...
【24h】

BG's Brazil success...

机译:BG在巴西的成功...

获取原文
获取原文并翻译 | 示例
           

摘要

BG Group and its partners have had record results from two drill stem tests (DSTs) on the Iracema well (4-RJS-647 or 4-BRSA-711-RJS) in the BM-S-11 appraisal area in the Santos Basin pre-salt, offshore Brazil. DSTs were carried out over two zones with aggregate production amounting to 10,500 b/d of light 32° API oil and 17 MMcf/d (481.6 Mcm/d) of gas. Flow rates were facilities constrained.
机译:BG集团及其合作伙伴在Santos盆地前BM-S-11评估区的Iracema井(4-RJS-647或4-BRSA-711-RJS)上进行了两次钻杆测试(DST)的结果记录在案盐,巴西近海。 DST在两个区域进行,总产量为轻质32°API油10,500 b / d,气体17 MMcf / d(481.6 Mcm / d)。流量受到设施的限制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号