Aminex is due to spud in Egypt within weeks.The firm is operator of the West esh el Mellaha Block 2 in the Gulf of Suez and hopes to spud the Malak-1 well in mid-February.The Malak-1 well,the first of two back-to-back wells in the programme,will be drilled to a total depth of 12,500ft(3,800m)and is anticipated to take 30 days.
展开▼
机译:Aminex将在几周内在埃及开钻。该公司是苏伊士湾的West esh el Mellaha Block 2的运营商,并希望在2月中旬开挖Malak-1井。该计划中的两个背靠背井将钻探至12500英尺(3,800m)的总深度,预计需要30天。
展开▼