首页> 外文期刊>E&P daily >Ombrina Mare spud delay
【24h】

Ombrina Mare spud delay

机译:Ombrina Mare的土豆桩延误

获取原文
获取原文并翻译 | 示例
           

摘要

Mediterranean Oil & Gas(MOG)expects to spud an appraisal well on the Ombrina Mare 2 prospect offshore Italy towards the end of next month.MOG said the Galloway jackup drilling platform is due to begin mobilisation to the well site in around three weeks.The operator said the rig operator had advised that the short delay of approximately two weeks was due to extended operations on its current engagement.
机译:地中海石油天然气公司(MOG)预计在下个月底之前在意大利近海的Ombrina Mare 2探矿区上开一口评估井,MOG表示加洛韦自升式钻井平台将在大约三周内开始动员到该井场。运营商表示,钻机运营商已告知,大约两周的短暂延迟是由于其目前的交战时间延长所致。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号