首页> 外文期刊>Building Engineer >OSC AND STEEL FRAME SYSTEMS
【24h】

OSC AND STEEL FRAME SYSTEMS

机译:OSC和钢框架系统

获取原文
获取原文并翻译 | 示例
           

摘要

There is no avoiding the fact that the current-economic climate is causing problems for the construction industry. Developers are losing money and cutting jobs and every week seems to bring yet more bad news. As if to rub salt into the wound, whilst 167,577 new homes were built in the public and private sectors during 2007, this year the predicted figure looks set to shrink to less than 100,000. In stark contrast, pressure is mounting on local government and the construction industry alike to meet the ambitious goals outlined in the Government Housing Green Paper which set the target of delivering three million new homes by 2020. Despite warnings from the National Housing Federation that this target is 'almost impossible' to meet, the Department for Communities and Local Government (DCLG) is sticking by its guns and remains committed to the target as a long-term aim.
机译:不可避免的事实是当前的经济气候正在给建筑业带来问题。开发人员正在亏损并且裁员,而且每周似乎都会带来更多的坏消息。好像在往伤口上撒些盐一样,2007年在公共和私人部门建造了167,577套新房屋,而今年的预测数字似乎将减少到不足100,000个。与之形成鲜明对比的是,要实现《政府住房绿皮书》中概述的宏伟目标,当地政府和建筑业都面临着巨大压力,该绿皮书设定了到2020年交付300万套新房屋的目标。尽管全国住房联合会警告说,这一目标这是“几乎不可能”实现的,社区和地方政府部(DCLG)坚持不懈,并长期致力于实现这一目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号