首页> 外文期刊>EC&M >Prepare your bidders with an accurate scope-of-work: to ensure an accurate bid on your next OSP project, a detailed scope-of-work is essential
【24h】

Prepare your bidders with an accurate scope-of-work: to ensure an accurate bid on your next OSP project, a detailed scope-of-work is essential

机译:为投标人准备准确的工作范围:要确保对下一个OSP项目进行准确的投标,详细的工作范围至关重要

获取原文
获取原文并翻译 | 示例
       

摘要

Building a detailed scope-of-work is a critical step in the design process. Inaccurate bids, confusion, and misunderstanding can result if you don't give proper attention to this important task. To accurately convey all that's involved in your next OSP project, you need to assume many roles, including that of author, scheduler, bidder, designer, material manager, and sometimes even lender. In this 10th installment of EC&M's 12-part look at the Second Edition of BICSI's Customer-Owned Outside Plant Manual, we discuss the suggested items and methods of building a quality scope-of-work for your next OSP project. All of the material discussed in the previous installments of this series has set the foundation for this crucial step in the overall process.
机译:建立详细的工作范围是设计过程中的关键步骤。如果您没有适当地注意这项重要任务,可能会导致出价,混乱和误解不正确。为了准确传达下一个OSP项目中涉及的所有内容,您需要承担许多角色,包括作者,调度程序,投标人,设计师,物料经理,有时甚至是贷方。在EC&M的第12部分的第10部分中,对BICSI客户拥有的外部工厂手册第二版进行了讨论,我们讨论了为您的下一个OSP项目建立质量工作范围的建议项目和方法。本系列前几期中讨论的所有材料为整个过程中的这一关键步骤奠定了基础。

著录项

  • 来源
    《EC&M》 |2002年第10期|共3页
  • 作者

    Joe A. Hite;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 电工安装技术;
  • 关键词

  • 入库时间 2022-08-18 10:45:12

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号