首页> 外文期刊>Building Engineer >PROTECTING YOUR ASSETS WITH STROMA
【24h】

PROTECTING YOUR ASSETS WITH STROMA

机译:用STROMA保护您的资产

获取原文
获取原文并翻译 | 示例
       

摘要

Compliance with Part B is an integral and critical component in the building process and whilst the works remain largely unseen following installation, they reduce the risk of injuries or fatalities in the unfortunate event of a fire. Fire protection can prevent or delay the spread of fire, prevent structural damage to the building and allow the maximum window of opportunity for safe evacuation. Stroma's Contracting arm specialises in all forms of passive fire protection and delivers practical approaches for both meeting this legislative requirement and providing reassurance for the future occupant. There are essentially two types of passive fire protection. Fire protection is predominantly the insulation of structural steelwork from the heat transfer caused by fire, either byintumescent painting, coatings or protective boarding. This is normally undertaken at the early stages of construction and can be completed with little or no disruption.
机译:遵守B部分是建筑过程中不可或缺的重要组成部分,尽管在安装后仍无法看到工程,但它们可降低不幸着火时受伤或死亡的风险。防火可以防止或延迟火势蔓延,防止建筑物受到结构性破坏,并为安全疏散提供最大的机会。 Stroma的签约部门专门从事各种形式的被动防火,并提供实用的方法来满足此立法要求并为未来的乘员提供保证。被动防火基本上有两种类型。防火主要是使结构性钢结构与因起火的油漆,涂料或防护板引起的热传递隔离开来。这通常是在施工初期进行的,几乎没有中断即可完成。

著录项

  • 来源
    《Building Engineer》 |2009年第1期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 09:11:51

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号