首页> 外文期刊>Building Engineer >EARLY ASSESSMENT OF FLOOD RISK CAN AVOID COSTLY REDESIGN
【24h】

EARLY ASSESSMENT OF FLOOD RISK CAN AVOID COSTLY REDESIGN

机译:提前评估洪水风险可以避免重新设计

获取原文
获取原文并翻译 | 示例
       

摘要

Many planning applications for new developments are coming II unstuck as environmental regulators tighten the rules surrounding flood risks. Historically, the risk of flooding from rivers has been the main reason for this type of planning objection but there is now a new emphasis being placed on site drainage and on the flood potential from uncontrolled runoff of surface water. The Government's drive to redevelop brownfield sites, many of which are situated next to rivers, has also highlighted flooding issues.
机译:随着环境监管机构收紧有关洪水风险的规则,许多新开发项目的规划应用程序即将发布。从历史上看,河水泛滥的风险一直是造成这种计划异议的主要原因,但现在人们将新的重点放在工地排水和不受控制的地表水径流带来的洪灾潜力上。政府推动重建棕地的努力,其中许多地处河边,也突出了洪水问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号