Assessment of the process, nature and impact of rehabilitation for development of a moderniZation strategy for national irrigation systems in the Philippines

机译:评估恢复进程,性质和对菲律宾制定国家灌溉系统现代化战略的影响

获取原文
获取原文并翻译 | 示例
           

摘要

Data on medium- to large-scale canal irrigation systems in the Philippines suggest that rehabilitation projects were not sufficient to close the gap between actual area irrigated and irrigation service area. This study analysed the underlying details of various rehabilitation and improvement works in three canal irrigation systems to identify an effective approach to close this gap. The findings show that the rehabilitation works generally focused on maintaining the original canals. Canal lining was the most common improvement work. The planning and design process adopted lacked revalidation of design criteria and assumptions used in the original system design. It did not have the benefit of diagnostic assessment studies. No technical assessments of water supply adequacy for proposed projects were carried out. The findings also indicate that the potential for increasing the actual area irrigated lay in augmentation of water supply, reuse of drainage water, use of adjustable gates at major water distribution points and strategic timing of irrigation schedules between tertiary areas to adapt to prevailing hydrological regimes. Consideration of these findings and an increased attention to consistency among available water supply, irrigation demand, physical design of structures and a realistic operational plan can greatly enhance the impacts of the irrigation modernisation plan in the Philippines. Copyright (c) 2015 John Wiley & Sons, Ltd.
机译:菲律宾中到大型渠道灌溉系统的数据表明,修复项目不足以缩小实际灌溉面积与灌溉服务区之间的差距。这项研究分析了三个渠道灌溉系统中各种修复和改善工作的基本细节,以确定缩小这一差距的有效方法。调查结果表明,修复工作通常集中在维护原始运河上。运河衬砌是最常见的改善工作。采用的规划和设计过程缺乏对原始系统设计中使用的设计标准和假设的重新验证。它没有诊断评估研究的好处。没有对拟议项目的供水充足进行技术评估。研究结果还表明,增加实际灌溉面积的潜力在于增加供水量,排水再利用,在主要配水点使用可调闸门以及在第三地区之间适应常规水文状况的灌溉计划的战略性时机。对这些发现的考虑以及对可用水供应,灌溉需求,结构的物理设计以及切实可行的运营计划之间一致性的关注日益增加,可以大大增强菲律宾灌溉现代化计划的影响。版权所有(c)2015 John Wiley&Sons,Ltd.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号