Field Tests and Behaviour Analysis of Saemangeum Inner Dike Construction with Geotextile Tube Method Applied

机译:土工布管法在大黄草内堤施工现场试验与性能分析

获取原文
获取原文并翻译 | 示例
       

摘要

Geotextile tubes hydraulically or mechanically filled with dredged materials have been successfully applied to hydraulic and coastal engineering in recent years (e.g. shore protection structures, sea dikes, groins, jetties, detached breakwaters). This method is becoming popular and has been widely applied in the developed countries of the world. It is economical as well as useful, and enables us to store and isolate contaminated materials obtained from harbour dredging. In this study, a numerical analysis was performed to investigate the behaviour of geotextile tubes in terms of various properties of the material, shape condition and pumping pressure. The computer program GeoCoPS was employed for this analysis. Also, field tests were conducted in order to identify the construction workability of Saemangeum inner dike when the geotextile tube method is applied. In the field tests, geotextile tubes of 62m in length and 4.0m in diameter were used. The field tests found that geotextile tubes, when filled, did not have the same diameter as the unfilled theoretical one, but might reach approximately 55% of the theoretical diameter. At that time, the effective height of a geotextile tube was about 2.2m. The behaviour during and after construction was measured to confirm the construction method and workability, which ended in successful identification. Copyright (c) 2016 John Wiley & Sons, Ltd.
机译:近年来,以液压或机械方式填充挖泥材料的土工布管已成功应用于水力和沿海工程(例如,海岸防护结构,堤防,腹股沟,码头,离岸防波堤)。这种方法正变得流行,并已在世界发达国家广泛应用。它既经济又有用,使我们能够存储和隔离从港口疏obtained中获得的受污染材料。在这项研究中,进行了数值分析,以研究土工布在材料的各种特性,形状条件和泵送压力方面的行为。使用计算机程序GeoCoPS进行此分析。此外,还进行了现场测试,以确认采用土工布管法时Saemangeum内堤的施工可操作性。在现场测试中,使用了长度为62m,直径为4.0m的土工布管。现场测试发现,土工布管在填充后的直径与未填充的理论管直径不同,但可能达到理论直径的55%。当时,土工布管的有效高度约为2.2m。测量施工期间和施工后的行为,以确认施工方法和可加工性,从而成功识别。版权所有(c)2016 John Wiley&Sons,Ltd.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号