CSN BF no. 2 has only three hot blast stoves. Owing to the operational risks as well as output losses associated with the BF operation with just two hot blast stoves, the revamping time of this equipment becomes a crucial issue, requiring special attention in each phase of the project from planning to execution so as to shorten the time as much as possible. According to this context, the present paper describes in detail the main technologies used in the last revamping of hot blast stoves carried out in February 2007. These technologies included an accelerated cooling down curve, air conditioning system (good working condition) and convection heating system, which in association with an innovative construction methodology, involving movable and multilevel platforms, has allowed the project to be completed from blow to blow in a record time of just 67 days and 10 h, resulting in a reduction of costs around R$3.4m.
机译:CSN BF号2个只有三个热风炉。由于仅使用两个热风炉的高炉操作会带来操作风险和输出损失,因此该设备的改造时间成为至关重要的问题,在项目的每个阶段(从计划到执行)都需要特别注意,以便缩短时间越长越好。根据这种情况,本文详细介绍了2007年2月进行的热风炉最新改造中使用的主要技术。这些技术包括加速冷却曲线,空调系统(良好的工作条件)和对流加热系统,结合创新的施工方法(包括可移动和多层平台),该项目得以在短短的67天零10小时的创纪录时间内完成,从而节省了约340万雷亚尔的成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号