Time is money and none more so than in the Olympics, as every delay puts more pressure on the finished build. Even though the location is known many years in advance, the actual process of creating the necessary stadia and additional buildings always involves last minute pressure, despite the best-laid plans. With pipework at the heart of any construction, ensuring it is installed with minimum delay is a priority for keeping to tight schedules. On many of the Olympic builds that Victaulic has been involved in, the company has been called in at the eleventh hour to re-work the piping outlines and troubleshoot piping problems that relate to time delays, on-site mains supply issues or overspends on budget.
机译:时间就是金钱,没有什么比奥运会更重要的了,因为每一次延误都会给完成的建筑带来更大的压力。即使位置已经提前很多年了,但是尽管规划得最好,但创建必要的体育场和其他建筑物的实际过程始终需要最后一刻的压力。由于管道是任何建筑的核心,因此要确保按时间表进行安装,首先要确保以最小的延迟安装管道。在唯特利参与的许多奥林匹克建筑中,该公司在第11小时被要求对管道轮廓进行重新设计并解决与时间延迟,现场主电源供应问题或预算超支有关的管道问题。

著录项

  • 来源
    《Building Engineer》 |2005年第11期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 09:11:50

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号