...
首页> 外文期刊>E & P: A Hart Energy Publication >Deployed liner system enables efficient repair of parted pipe
【24h】

Deployed liner system enables efficient repair of parted pipe

机译:部署的衬里系统可有效修复分离的管道

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

CT deployment and no drill-out requirement saves days of rig time while delivering the well to its full production potential. An operator completing a natural gas well in the Marcellus Shale of northeastern Pennsylvania encountered a casing integrity problem during the 12th stage in a planned 30-stage fracturing operation. Loss of wellbore integrity, which the operator suspected was caused by a leaking connection in the heel of the well, prevented completion of the remaining 18 stages.
机译:CT 部署和无钻探要求可节省数天的钻机时间,同时将油井发挥其全部生产潜力。在宾夕法尼亚州东北部的马塞勒斯页岩完成一口天然气井的运营商在计划中的 30 阶段压裂作业的第 12 阶段遇到了套管完整性问题。操作人员怀疑井筒完整性的丧失是由井尾连接泄漏造成的,导致其余18个阶段无法完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号