首页> 外文期刊>International Oil Daily >Marathon’s Revenues Jump
【24h】

Marathon’s Revenues Jump

机译:马拉松的收入猛增

获取原文
获取原文并翻译 | 示例
       

摘要

Despite the Macondo oil spill and the moratorium on deepwater drilling in the Gulf of Mexico, Marathon Oil’s primary activities in the Gulf of Mexico are not slowing down, the company told investors on its second quarter earnings conference call. Marathon reported that its deepwater Droshky development in the Gulf of Mexico is on time and under budget. The project consists of four development wells tied back to a third-party and expected to have a peak production of approximately 45,000 b/d of hydrocarbons and 30 million cubic feet per day (MMcf/d) of natural gas. Production at Droshky started Jul. 15, the first startup of production in the deepwater Gulf of Mexico since the US moratorium on drilling as a result of the Macondo oil spill. The US ban permits development drilling related activities.
机译:该公司在第二季度财报电话会议上告诉投资者,尽管Macondo漏油事件和暂停在墨西哥湾进行深水钻探,马拉松石油在墨西哥湾的主要活动并没有放缓。马拉松报道说,它在墨西哥湾的深水Droshky开发已经按时完成,而且预算不足。该项目包括与第三方捆绑在一起的四个开发井,预计将达到约45,000桶/天的碳氢化合物日产量和3000万立方英尺/天的天然气日产量峰值。 Droshky的生产于7月15日开始,这是自美国因Macondo漏油而暂停钻探以来,在墨西哥湾深水区的首次生产。美国禁令允许与开发钻井有关的活动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号