首页> 外文期刊>International Oil Daily >Chevron Set to Launch Carbonate Steam Flood First in Neutral Zone
【24h】

Chevron Set to Launch Carbonate Steam Flood First in Neutral Zone

机译:雪佛龙将在中立地区率先启动碳酸盐蒸汽驱

获取原文
获取原文并翻译 | 示例
       

摘要

US major Chevron will soon launch a large-scale steam injection pilot at its onshore Neutral Zone concession, which it renewed recently. If the trial is successful, Chevron plans to start full field development by 2017, a top official said Tuesday. Guy Hollingsworth, Chevron's president for exploration and production Europe, Eurasia and Mideast, said the venture will begin injecting steam into the carbonate reservoirs in the Wafra field in July. "This is the first time that anyone has tried a large-scale steam flood project in carbonate [reservoirs]. It has huge potential for the whole Middle East," he said on the sidelines of an Abu Dhabi conference.
机译:美国大型雪佛龙公司不久将在其陆上中性区特许权上启动大规模蒸汽注入试验,该特许权最近得到续签。雪佛龙公司高级官员周二表示,如果试验成功,雪佛龙公司计划在2017年之前进行全面开发。雪佛龙公司欧洲,欧亚大陆和中东地区的勘探和生产总裁盖伊·霍林斯沃思(Guy Hollingsworth)表示,该合资企业将于7月开始向Wafra油田的碳酸盐岩储层注入蒸汽。他在阿布扎比会议的间隙说:“这是任何人第一次尝试在碳酸盐(储层)中进行大规模的蒸汽驱工程。它对整个中东地区都具有巨大的潜力。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号