...
首页> 外文期刊>International Mining & Minerals >The London Connection - Planning and Design of a High Voltage Cable Tunnel Supplying Power to Central London
【24h】

The London Connection - Planning and Design of a High Voltage Cable Tunnel Supplying Power to Central London

机译:伦敦连接-向伦敦市中心供电的高压电缆隧道的规划和设计

获取原文
获取原文并翻译 | 示例
           

摘要

The paper describes the planning and design of the 20 km-long cable tunnel between Elstree in Hertfordshire and St John's Wood in Westminster, part of the National Grid Company's programme to upgrade and strengthen supplies to London. This project has a number of challenges in terms of project management, with two separate major contractors for tunnel construction and supply of the high voltage cables. In addition, there are complex interfaces with new sub-stations to be constructed both at Elstree and St John's Wood. The design of the alignment is discussed, with reference to the relationship to other underground structures and the assessment of geological conditions, based on a ground investigation programme. Confirming the route alignment by obtaining wayleaves for the underground alignment and permission for buildings at the shaft sites has controlled the scheme planning process.
机译:该文件描述了国家电网公司升级和加强伦敦电力供应计划的一部分,该工程规划了位于赫特福德郡Elstree和威斯敏斯特州圣约翰伍德之间的20公里长的电缆隧道的规划和设计。该项目在项目管理方面面临许多挑战,由两个独立的主要承包商负责隧道建设和高压电缆的供应。另外,在Elstree和St John's Wood都将建有复杂的接口与新的变电站。根据地面调查计划,结合与其他地下结构的关系以及对地质条件的评估,讨论了路线的设计。通过获得用于地下路线的通行路来确认路线路线并在竖井站点获得建筑物的许可,已经控制了方案规划过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号