A new 50 m tall structure is to be built at Nutmeg Lane, London, and is to be founded on 195 bearing piles. The footprint of the building is within the old backfilled East India Dock. Ground conditions comprise deep fill with obstructions, overlying London Clay, and then the Lambeth Group, Thanet Sand and Upper Chalk. Cementation was appointed as the main contractor for the enabling and foundation works for this prestigious project. This package included the preparation of the site, probing and removal of obstructions, piling works and the construction of underground fuel tanks. This paper will firstly describe the design aspects of the piling works and will develop the reasons why base grouting of the piles was deemed unnecessary.
机译:将在伦敦的肉豆蔻巷建造一个新的50 m高的结构,并将在195个承重桩上建造。该建筑的占地面积位于旧的回填东印度码头内。地面条件包括用障碍物深层填充,覆盖伦敦粘土,然后是兰贝斯群,塞内特沙和上粉笔。水泥被任命为这一享有声望的项目的扶持和基础工程的主要承包商。该配套包括场地准备,探测和清除障碍物,打桩工程以及建造地下油箱。本文将首先描述打桩工程的设计方面,并阐述为什么认为桩基不需要灌浆的原因。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号