首页> 外文期刊>International Journal of Rock Mechanics and Mining Sciences >Stability of underground mine development intersections during the life of a mine plan
【24h】

Stability of underground mine development intersections during the life of a mine plan

机译:矿山计划生命周期内地下矿山开发交叉口的稳定性

获取原文
获取原文并翻译 | 示例
           

摘要

The stability of mine developments is of utmost importance during the planned period of production or the life of a mine plan. Many Canadian underground mines use transverse stoping with delayed backfill to extract tabular ore deposits. These methods require access to the orebody through a number of sill drives and cross cuts which link the orezone to the haulage drift hence creating intersections on multiple levels. This paper presents the results of a study on the stability of mine development intersections at Garson Mine of Vale in Sudbury, ON, Canada. Multi-point borehole extensometers (MPBX) are used to monitor the rock deformations of an intersection as mining activities progress. The monitoring results are used to calibrate a multi-level FLAC3D numerical model, which has been developed to assess the stability of the intersection It is shown that stope extraction causes a lateral shift to the intersection, accompanied by high shear stress in the roof. It is also shown that same-level mining has stronger influence on the stability of the intersection than lower-level mining. (C) 2014 Elsevier Ltd. All rights reserved.
机译:在计划的生产时期或计划的整个生命周期中,矿山开发的稳定性至关重要。许多加拿大地下矿山使用横向停止和延迟回填来开采片状矿床。这些方法需要通过多个门槛驱动器和横切面进入矿体,这些底盘将矿石带与运输漂移联系起来,从而在多个层面上形成交叉点。本文介绍了加拿大安大略省萨德伯里Vale的Garson矿井开发交叉口稳定性的研究结果。随着采矿活动的进行,多点钻孔引伸计(MPBX)用于监视路口的岩石变形。监测结果用于校准多级FLAC3D数值模型,该模型已开发用于评估路口的稳定性。研究表明,采场会导致向路口的横向偏移,并伴随着屋顶的高剪切应力。研究还表明,同级别采矿对交叉路口稳定性的影响要强于较低级别的采矿。 (C)2014 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号