...
首页> 外文期刊>International Journal of Services and Operations Management >Solving a generalised precedence multi-objective multi-mode time-cost-quality trade-off project scheduling problem using a modified NSGA-II algorithm
【24h】

Solving a generalised precedence multi-objective multi-mode time-cost-quality trade-off project scheduling problem using a modified NSGA-II algorithm

机译:使用改进的NSGA-II算法求解广义优先的多目标多模式时间成本质量权衡的项目调度问题

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In this paper, a new mathematical formulation is proposed to model a generalised precedence multi-objective multi-mode time-cost-quality trade-off project scheduling problem (GPDTCQTP). Afterwards, a modified NSGA-II algorithm is developed to solve the proposed GPDTCQTP. The modified NSGA-II utilises a dynamic parameter tuning and a heuristic self-adaptive constraint handling strategy. These properties result in proper performance in regenerating the Pareto front of the GPDTCQTP. Investigating the efficiency of proposed algorithm several benchmark instances are systematically generated and solved. The proposed procedure is straightforward and results are promising.
机译:本文提出了一种新的数学公式来对广义优先的多目标多模式时间-成本-质量权衡的项目调度问题(GPDTCQTP)进行建模。之后,开发了一种改进的NSGA-II算法来解决提出的GPDTCQTP。修改后的NSGA-II利用动态参数调整和启发式自适应约束处理策略。这些属性在重新生成GPDTCQTP的Pareto前沿方面具有适当的性能。为了研究所提出算法的效率,系统地生成并解决了几个基准实例。拟议的程序简单明了,结果令人鼓舞。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号