Impact of varying levels of setup time on the performance of algorithms for scheduling a flow shop with sequence dependent setup time

机译:不同设置时间对顺序依赖的设置时间对流水车间调度算法性能的影响

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents a comparative study of two algorithms for the flow shop scheduling problem with sequence dependent setup time. The objective is to investigate the effect of setup time on makespan criterion under varying proportions of setup time. The two constructive algorithms used in the study involve a completely different approach in constructing the sequence. The first algorithm is processing time-based and the second algorithm setup time-based. Taillard benchmark flow shop problems are used for the development of benchmark problems for flow shop scheduling with sequence dependent setup time. Eight different levels of setup time matrices are developed for each problem size. The two algorithms are tested for the 960 problem instances developed. The results are analysed graphically and statistically for the varying levels of setup time. The analysis reveals that the setup time-based algorithm improves its performance when the setup time increases as a percentage of processing time. The results of statistical analysis validate the variability in performance of the two algorithms considered at different levels of setup time.
机译:本文针对序列依赖的建立时间,针对流水车间调度问题的两种算法进行了比较研究。目的是研究在不同设置时间比例下,设置时间对制造期限标准的影响。研究中使用的两种构造算法在构建序列时涉及完全不同的方法。第一种算法基于时间,第二种算法基于时间。 Taillard基准流水车间问题用于开发具有顺序依赖性建立时间的流水车间调度的基准问题。针对每个问题大小,开发了八个不同级别的建立时间矩阵。针对开发的960个问题实例测试了这两种算法。针对安装时间的不同水平,对结果进行图形和统计分析。分析表明,当建立时间占处理时间的百分比增加时,基于建立时间的算法会提高其性能。统计分析的结果验证了在设置时间不同的情况下考虑的两种算法的性能差异。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号