首页> 外文期刊>International Journal of Operational Research >Estimating order delivery times and fleet capacity in freight rail networks: part II - analytic approximation
【24h】

Estimating order delivery times and fleet capacity in freight rail networks: part II - analytic approximation

机译:估计货运铁路网络中的订单交付时间和车队容量:第二部分-解析近似

获取原文
获取原文并翻译 | 示例
           

摘要

Rail transit is a critical component of intermodal supply chain networks. We consider the problem of providing order delivery time quotations in an unscheduled rail network, where customers place orders requiring movement of freight between specified origins and destinations. Each order is fulfilled as soon as the required rolling stock, e.g., locomotive and rake, can be assembled at the origin. Estimating an order's delivery time is a complex task, depending upon the available fleet capacity, deadhead policy and the level of congestion present in the network. In this paper, we develop an analytic approximation to estimate delivery time quotations for freight movements, along with required fleet capacity to meet a desired service level. The quality of the analytic approximation herein is validated using a real numerical example from the Indian Railway system, one of the largest freight carriers in the world.
机译:铁路运输是联运供应链网络的重要组成部分。我们考虑在计划外的铁路网络中提供订单交付时间报价的问题,在该网络中,客户下达的订单需要在指定的起点和目的地之间移动货物。只要可以在原点组装所需的机车(例如机车和耙子),就可以完成每个订单。估计订单的交付时间是一项复杂的任务,具体取决于可用的机队容量,空头策略和网络中存在的拥塞程度。在本文中,我们开发了一种分析近似方法来估计货运的交货时间报价,以及满足所需服务水平所需的机队容量。本文使用世界上最大的货运公司之一印度铁路系统的实际数值示例验证了此分析近似法的质量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号