首页> 外文期刊>International Journal of Operational Research >A double-track train rescheduling for incident conditions: optimisation model and decomposition method
【24h】

A double-track train rescheduling for incident conditions: optimisation model and decomposition method

机译:事故条件下的双轨列车调度:优化模型和分解方法

获取原文
获取原文并翻译 | 示例
           

摘要

This paper studies a double-track train rescheduling problem, when an un-foreseen incident over a specific time horizon occurs. We solve the problem by utilising a rescheduling technique named bi-operational approach. An incident-based mixed-integer rescheduling model is proposed which is solved using CPLEX software which automatically generates optimal solutions. To reduce the computation time, an innovative method is proposed which decomposes the main problem to five smaller sub-problems, each of which is solved by branch-and-bound algorithm. Moreover, a novel heuristic is proposed which divides the available computation time between sub-problems proportionately depending on their sizes. An experimental analysis, on two double-track railways of Iranian network, indicates that the decomposition method provides near-optimal solutions with much shorter computation times compared with CPLEX. The analysis also provides evidence for effectiveness of the proposed heuristic in tackling large-scale problems; so that good feasible solutions are achievable in limited times compatible with real-time use.
机译:本文研究了在特定时间范围内发生意外事件时的双轨列车重新调度问题。我们通过使用称为双向操作方法的重新计划技术解决了该问题。提出了一种基于事件的混合整数重新调度模型,该模型使用CPLEX软件自动生成最佳解决方案进行求解。为了减少计算时间,提出了一种创新的方法,该方法将主要问题分解为五个较小的子问题,每个子问题都通过分支定界算法进行求解。此外,提出了一种新颖的启发式方法,其根据子问题的大小按比例划分子问题之间的可用计算时间。在伊朗网络的两条复线铁路上进行的实验分析表明,与CPLEX相比,该分解方法可提供近似最优的解决方案,且计算时间短得多。该分析还为所提出的启发式方法解决大规模问题的有效性提供了证据。因此,可以在有限的时间内实现与实时使用兼容的良好可行的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号