Microscopic examination of clinker from the new cement plant, combined with laboratory studies of the combinability of the feed at a range of temperatures, indicated the actions needed to improve clinker quality from the kiln. The most important action was to ensure that the sand fraction of the raw mill output was ground such that less that two per cent acid-insoluble residue remained on a 45pm sieve from the whole feed.
展开▼