首页> 外文期刊>International Journal of Applied Engineering Research >The Implementation of Material Requirement Planning Techniques in Crane Hook Assembly
【24h】

The Implementation of Material Requirement Planning Techniques in Crane Hook Assembly

机译:吊钩总成物料需求计划技术的实现

获取原文
获取原文并翻译 | 示例
           

摘要

In the very fast moving world, different products are being released by the manufacturers every day to satisfy the needs of the customer. Any manufacturer would want his product to be of high quality and at the same time he/she has to deliver the required number of products to the customers within short duration of time. To aid the manufacturer, computational techniques like MRP (Material Requirement Planning) can be very useful. MRP is important to ensure material availability, to find out the number of parts, components and materials required to produce each end item and also to provide the schedule when each of these materials, parts and components should be ordered or produced. By using MRP techniques we can manufacture and release the demanded products in an easy manner in today's market. Crane hook as a hoisting fixture designed to engage a ring or link of a lifting chain has considerable importance in the manufacturing industry and any customer or manufacturer would like the product to satisfy the twin objectives of very high quality and very fast production. In this paper, we have discussed how to manufacture the crane hook products in a nippy manner and send it to the market as soon as possible. We have enunciated the discussion by providing an overview of crane hook and its parts and further illustrated our scheduled lead time, net requirements of the product crane hook and schedule of order release chart. We believe that this MRP would definitely suit the manufacturing of crane hook to satisfy both the needs of quality and very fast delivery.
机译:在瞬息万变的世界中,制造商每天都会发布不同的产品,以满足客户的需求。任何制造商都希望他的产品高质量,同时他/她必须在短时间内向客户交付所需数量的产品。为了帮助制造商,MRP(材料需求计划)等计算技术可能会非常有用。 MRP对于确保材料的可用性,找出生产每个最终产品所需的零件,组件和材料的数量以及提供订购或生产这些材料,零件和组件中的每一个的时间表至关重要,这一点很重要。通过使用MRP技术,我们可以在当今市场上轻松地制造和发布所需产品。起重机吊钩作为用于与起重链的环或链节啮合的起重装置,在制造业中具有相当重要的意义,任何客户或制造商都希望产品满足高质量和快速生产的双重目标。在本文中,我们讨论了如何快速制造起重机吊钩产品并将其尽快投放市场。我们通过提供起重机吊钩及其零件的概述来阐明讨论,并进一步说明了我们的计划交货时间,产品起重机吊钩的净需求和订单发布时间表。我们相信,该MRP绝对适合起重机吊钩的制造,以满足质量和快速交付的需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号