Down Hill conveyor in Severoceske Doly a.s., Doly nastup Tusimice

机译:Severoceske Doly a.s.,Doly nastup Tusimice的下坡传送带

获取原文
获取原文并翻译 | 示例
           

摘要

The project started in spring 2000, when enduser Mine Tusimice opened a tender for a new 1250 m long coal conveyor transporting coal directly from the mine to the power plant nearby. The tender was won by the Czech company Klement, who had two solutions:Because of the relatively high level difference between the head end and tail end of the conveyor systems (52 m) and the relatively short braking time (approx. 12 s) required, it was necessary to:either split the conveyor into two parts with two drive stations and brakes on the high speed side, orbuild a single conveyor with brakes on the drive station and on the tail end as well.The main task was to stop this new declining conveyor system within 12 5 in case of an emergency.
机译:该项目始于2000年春季,当时最终用户Mine Tusimice招标建造了一条新的1250 m长的煤炭输送机,将煤炭直接从煤矿直接输送到附近的电厂。捷克公司Klement赢得了招标,该公司有两个解决方案:由于传送系统的头端和尾端之间的高度差(52 m)和所需的较短制动时间(大约12 s) ,有必要:要么将传送带分成两个部分,在高速侧上有两个驱动站和制动器,要么在驱动站和尾端上构造一个带制动器的单个传送带。主要任务是停止传送带紧急情况下在12 5内安装了新的下降输送机系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号