首页> 外文期刊>Internatinoal gas engineering and management >ABB wins $15-million oil and gas deal down under
【24h】

ABB wins $15-million oil and gas deal down under

机译:ABB赢得1500万美元的油气合同

获取原文
获取原文并翻译 | 示例
           

摘要

The $15-million contract concerns a new semi-submersible central processing facility (CPF) at the Ichthys oil and gas field in the Timor Sea, off Western Australia. When completed in 2016 the CPF will be the largest offshore production facility in the world. The Ichthys oil and gas field is estimated to contain 12.8-trillion cubic feet of gas and 527-million barrels of condensate. It is also thought to have an operational life of more than 40 years. Gas from the field will undergo preliminary processing at the offshore CPF to remove water and raw Liquids, including a large proportion of the condensate. The condensate will be pumped to a floating production, storage and offloading (FPSO) vesseL anchored nearby, from which it will be transferred to tankers for delivery to markets.
机译:这份价值1500万美元的合同涉及位于西澳大利亚州帝汶海Ichthys油气田的一座新的半潜水式中央处理设施(CPF)。 CPF将于2016年竣工,将成为世界上最大的海上生产设施。 Ichthys油气田估计包含12.8万亿立方英尺的天然气和5.27亿桶的凝析油。人们还认为它的使用寿命超过40年。来自田间的天然气将在离岸CPF进行初步处理,以去除水和原始液体,包括大部分冷凝水。冷凝水将被泵送到附近锚固的浮式生产,储存和卸载(FPSO)VesseL,从中将其转移到油轮以交付市场。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号