【24h】

St Aidans canal and river diversion

机译:圣艾丹斯运河和河流改道

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

In March 1988 opencast coal mining at the St Aidans extension sitenear Leeds was brought abruptly to a halt by a cata- strophic failureof the 70 m deep excava- tion wall and the resulting inundation bythe River Aire. This paper describes the planning, design,construction and recov- ery of the site, which involved the con-struction of the first significant new section of canal in the UK forover 90 years. Environmental considerations were a major factor atall stages of the design and construction.
机译:1988年3月,由于70米深的挖掘墙发生灾难性破坏,导致艾尔河被淹没,利兹附近的圣艾丹斯扩建工地的露天煤矿开采突然停止。本文介绍了该地点的规划、设计、建造和修复,其中涉及英国第一段重要的新运河的建设,历时 90 多年。环境因素是设计和施工各个阶段的主要因素。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号