A scheduling method for Berth and Quay cranes

机译:A scheduling method for Berth and Quay cranes

获取原文
获取原文并翻译 | 示例
       

摘要

This paper discusses a method for scheduling Berth and Quay cranes, which are critical resources in port container terminals. An integer programming model is formulated by considering various practical constraints. A two-phase solution procedure is suggested for solving the mathematical model. The first phase determines the Berthing position and time of each vessel as well as the number of cranes assigned to each vessel at each time segment. The subgradient optimization technique is applied to obtain a near-optimal solution of the first phase. In the second phase, a detailed schedule for each Quay crane is constructed based on the solution found from the first phase. The dynamic programming technique is applied to solve the problem of the second phase. A numerical experiment was conducted to test the performance of the suggested algorithms.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号