...
首页> 外文期刊>e-Informatica: software engineering journal >Structured planning: deriving project views
【24h】

Structured planning: deriving project views

机译:Structured planning: deriving project views

获取原文
   

获取外文期刊封面封底 >>

       

摘要

Structured planning draws on the systems modelling approach of structured analysis and applies those ideas to project planning: the traditional elements of a project plan, the work breakdown structure and PERT diagram, are replaced by a levelledwork Bow diagramand adeliverable dictionary. A technique for providing flexible summaries of the new project model,viewing,has been defined to assist with project tracking and control. This paper develops a formal definition of work flow diagrams and the technique of viewing in order to lay a theoretical foundation for structured planning, such that a complete set of operations to build and edit a levelled work flow diagram and deliverable dictionary can be specified and implemented in an automated project management tool.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号