首页> 外文期刊>Industrial Technology >No pH problems at water treatment works
【24h】

No pH problems at water treatment works

机译:水处理厂没有pH值问题

获取原文
获取原文并翻译 | 示例
           

摘要

AUTOMATED PERISTALTIC PUMPS ARE HELPING TO CONTROL MANAGEMENT OF PH LEVELS AT CLAY LANE. After 14 years in continuous operation, the peristaltic pumps used for lime dosing at Clay Lane Water Treatment Works (WTW) have been upgraded as part of a project to optimise performance at the site. The water treatment works at Clay Lane, Rochdale, receives water from four reservoirs in the Naden Valley. Following treatment, up to 18 megalitres of water a day feeds into to Bamford Service Reservoir, from where it is supplied to over 46,000 properties in the region.
机译:自动蠕动泵正在帮助控制粘土车道上PH值的管理。经过连续运行14年后,Clay Lane水处理厂(WTW)的石灰计量用蠕动泵已经升级,这是优化现场性能的项目的一部分。罗奇代尔(Rochdale)克莱巷(Clay Lane)的水处理厂从纳登谷(Naden Valley)的四个水库接收水。经过处理后,每天多达18兆升的水流入Bamford Service水库,然后从该水供应到该地区的46,000多处房屋。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号