首页> 外文期刊>Industrial Technology >Conveyor tunnel links two quarries
【24h】

Conveyor tunnel links two quarries

机译:输送机隧道连接两个采石场

获取原文
获取原文并翻译 | 示例
           

摘要

WEG AND SUMITOMO HAVE COMBINED TO PROVIDE HIGH POWER DRIVE SYSTEMS FOR A UNIQUE 1.5KM TUNNEL CONVEYOR LINKING TWO LEICESTERSHIRE QUARRIES. When Midland Quarry Products (MQP) needed to recover the granite reserves from their Old Cliffe Hill Quarry, it had to overcome the problem that all of their processing equipment, crushers, screens and rail linked asphalt plant were in its existing New Cliff Quarry some miles away. Worse still, a village lay between the two quarries. Undaunted, MQP came up with a highly environmental solution: a 720m long tunnel through the hillside to link the two quarries, Now, thousands of tons of rock are transported through the tunnel each day on an overhead conveyor, which was supplied and installed by Whitwick Engineering and powered by specially manufactured drive packages comprising Sumitomo high strength Paramax gearboxes and WEG Premium Efficiency motors.
机译:WEG和SUMITOMO结合在一起,为连接两个LEICESTERSHIRE QUARE的独特1.5公里隧道输送机提供了高功率驱动系统。当Midland采石场产品(MQP)需要从其旧克里夫山采石场中回收花岗岩储量时,它必须克服以下问题:他们的所有加工设备,破碎机,筛分机和铁路沥青设备都位于现有的新悬崖采石场中远。更糟糕的是,两个采石场之间有一个村庄。 MQP毫不畏惧,提出了一个高度环保的解决方案:一条720m长的隧道穿过山坡连接两个采石场。现在,每天在高架输送机上将数千吨的岩石通过该隧道运输,由Whitwick提供并安装。工程并由专门制造的驱动组件提供动力,包括Sumitomo高强度Paramax变速箱和WEG高效能电机。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号