TENMILE CREEK: A STUDY OF STREAM RELOCATION1

机译:TENMILE CREEK:溪流RELOCATION1研究

获取原文
获取外文期刊封面目录资料

摘要

ABSTRACT:After input from various interested agencies, three miles of creek were relocated to facilitate the construction of Interstate 70 through Tenmile Canyon west of Denver. The 0.5.million dollar project was designed to provide fish habitat of equal value to that present before construction or, if possible, to improve this habitat.Construction techniques were designed to minimize damage to flora and fauna. After the channels were excavated, rock and log fish habitat structures were constructed.Two years after construction, a 4 percent chance flood occurred at the project area which made almost 75 percent of the habitat structures ineffective. Pool‐riffle ratios and quantity and quality of spawning areas remained essentially unchanged throughout the period. Population estimates indicated an increase in the number of fish in the postconstruction period compared to preconstruction numbers. Fish biomass estimates for the project area were comparable for the two periods. Aquatic invertebrate populations were unchanged as indicated by comparison of three pre‐ and postconstruction indi
机译:摘要:在各个感兴趣的机构提出意见后,三英里的小溪被重新安置,以促进 70 号州际公路的建设,穿过丹佛以西的 Tenmile Canyon。这个耗资50万美元的项目旨在提供与施工前同等价值的鱼类栖息地,或者在可能的情况下改善该栖息地。建筑技术旨在尽量减少对动植物的破坏。河道开挖后,建造了岩石和原木鱼类栖息地结构。施工两年后,项目区域发生4%的洪水,使近75%的栖息地结构无效。在此期间,池水比以及产卵区的数量和质量基本保持不变。种群估计表明,与施工前相比,施工后时期的鱼类数量有所增加。两个时期项目区的鱼类生物量估计数具有可比性。水生无脊椎动物种群没有变化,通过对三个施工前和施工后的 indi 进行比较表明

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号