首页> 外文期刊>Industrial Minerals >Austpac ERMS SR ongoing
【24h】

Austpac ERMS SR ongoing

机译:正在进行Austpac ERMS SR

获取原文
获取原文并翻译 | 示例
           

摘要

Austpac Resources NL, Sydney, has signed a research agreement with BHP Billiton to continue the ongoing development of Austpac's ERMS SR technology for the production of high grade synthetic rutile and the direct reduced iron co-product (DRI). Under the agreement, BHP Billiton will provide funds for: 9 the commissioning and operation of the equipment designed to prove Austpac's proprietary continuous metallisation process, which is now in the final stages of construction at the Newcastle plant additional modelling of the proprietary continuous leach vessel that will form part of the proposed ERMS SR demonstration plant planned for Newcastle a review and update of the capital cost estimate for the demonstration plant an independent concept level cost study to obtain updated capital and operating costs for a commercial scale ERMS SR plant The agreed work program will take approximately three months and should be completed in November 2006.
机译:悉尼的Austpac Resources NL已与必和必拓签署了一项研究协议,以继续进行Austpac的ERMS SR技术的持续开发,以生产高品质合成金红石和直接还原铁副产品(DRI)。根据该协议,必和必拓将提供以下资金:9旨在证明Austpac专有的连续金属化工艺的设备的调试和运行,该过程目前正在纽卡斯尔工厂的施工的最后阶段,该专有连续浸出容器的其他建模可用于将构成计划中的纽卡斯尔ERMS SR示范工厂的一部分,对示范工厂的资本成本估算进行审查和更新,进行独立的概念水平成本研究,以获取商业规模ERMS SR工厂的最新资本和运营成本商定的工作计划大约需要三个月,并应于2006年11月完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号