首页> 外文期刊>Industrial Minerals >Alkane's Dubbo zirconia progress
【24h】

Alkane's Dubbo zirconia progress

机译:烷烃的达博氧化锆研究进展

获取原文
获取原文并翻译 | 示例
           

摘要

Australian Zirconia Ltd (AZL), a wholly owned subsidiary of Perth-based gold miner Alkane Exploration Ltd, has embarked on the third, definitive phase of its feasibility study on the highly promising Dubbo zirconia project in New South Wales, 400km north-west of Sydney.Following the completion of the first two phases of the study by industrial minerals consultants DEMA Pty Ltd, the total measured and inferred resource at Dubbo has been expanded to 83m. tonnes containing 1.91 percent zirconia, 0.138 percent yttria and 0.720 percent rare earth oxides, as well as 0.448 percent niobium pentoxide, 0.027 percent tantalum pentoxide and 0.041 percent hafnia.
机译:位于珀斯的金矿公司Alkane Exploration Ltd的全资子公司澳大利亚氧化锆有限公司(AZL)已开始其可行性研究的第三阶段,即可行性研究的第三阶段,该阶段是极具前景的新南威尔士州达博氧化锆项目,位于西北400公里处。悉尼(Sydney):在工业矿物顾问DEMA Pty Ltd完成前两个阶段的研究之后,Dubbo的总可测和推断资源已扩大至8300万。吨,含1.91%的氧化锆,0.138%的氧化钇和0.720%的稀土氧化物,以及0.448%的五氧化二铌,0.027%的五氧化二钽和0.041%的氧化f。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号